I've been working every day on the car, but the pictures show very little progress. Funny how little things take so much time but so so little.
The turn signals are now totally hooked up and work. The flasher can that I used was defective, so after buying a new one and switching a couple of wires around its all better. The glass is now installed. The glass guy put the bottom channels on the door glass backwards. I had to hammer them off flip flop them and pound them back on. I did it without breaking the glass, that was good. The rubber floor mat is all fitted and cut and installed for the last time, the seat belt hooks are in, all the trim button heads on the drive shaft tunnel are in. I painted the tunnel satin blue to match the trans tunnel and the glass garnish. The windshield wiper is in and wired. The little switch panel is for the wiper, fuel pump and fan. Each toggle switch has also a indicator light that shows that the switch is on. There is at least 12 wires behind that panel. I decided to cover the kick panel with the leather so Al didn't have to work with all the wires. I like the look of the leather. The head light test almost worked. I had low beams but not high beams. I installed a relay on the high beam side to protect the switch from the halogen high beam draw. After a bit of checking I found a bad connection on one of the relay wires. Simple but took a little time. That's how the last two weeks went, everything took tons of time.
Tomorrow I have to fit the hood sides. I still need to adjust and bleed the brakes. I need to bleed the clutch line too. The E brake cables will need to be hooked up and adjusted. Its almost done. It will go the interior shop (Rapid Upholstery) in the next 2 weeks. I head to the GNRS later this month, so it all needs to be done in the next couple of weeks.
Wednesday, January 2, 2013
Subscribe to:
Post Comments (Atom)
1 comment:
That thing is really looking awesome. I see alot of attention to details. Great job. I can't wait to see it in person.
Post a Comment